ASME Tanks

With the cost of new steel rising through the roof, reconditioned ASME tanks will give you the appearance, protection, and convenience of a new tank at a portion of the cost.

Tank Process:

  • Steel shot blasted to bare metal
  • Corrosion inspected for excessive pitting
  • Leak pressure tested
  • Gauges are removed, inspected and replaced as needed
  • Finished with Carboline two-part urethane system and painted to the customer’s color specifications
  • Full Rego Valve replacement with Presto Tap
  • Vacuum purged
  • One Year Warranty

Gallery


  • Blasting
  • Vacuum Purge
  • New Rego Valves
  • Carboline Paint